Data Centre What are they made up of:Virtual Tour
Visiting & finding out more about new Data Center has always been a craze for me.Im taking you also along with me on this Virtual Tour.
MDA Federal Inc.'s award-wining hierarchical storage management system handles nearly a petabyte of geospatial data.
Here some more images of a Storage Setup being built ( In continuation with previous post about how to set up a storage lab)
Installing the Apple ( LSI) branded Fiber Channel HBA into the IBM e326
Fiber channel HBA installed in the cluster master node
Waiting on Xserve RAID and the rack to arrive with 24 hours left in our build deadline
This adaptor connects the IBM e326 serial port to the Digi CM 16 serial console server.
"cluster complete" deadline day. The rack had still not arrived by this time.
Core pieces are installed.
Rear view. No cabling yet.
With Cabling
side cable runs
Rack with all systems Up and running
Close Up
Configuration/Management Console
Email ur friends about this blog & CC me roger.smithson@gmail.com . I Will send u links of Storage or Tech Job Video with lots of Real Industry Exposure for every friend you email. I want to spread the word & help more people thru this blog .U'll also get many more Surprise Gifts to Boost your Career & Salary.
Previous Posts on Storage Technology Jobs
1 comment:
Hey Roger!
Thanks for all this info..
How about posting something about your self..:)
Sarfaraz
Post a Comment